Waec Model Questions Vol1 2021 Geography Question 43
Practice objective / multiple choice question 43 from the 2021 Waec Model Questions Vol1 Geography examination.
A government is planning a new cement factory and has identified three possible sites. The data for each site are:\n\nSite X: distance to limestone quarry = 30 km, land price = ₦150,000 per hectare, land required = 20 ha.\nSite Y: distance to limestone quarry = 70 km, land price = ₦120,000 per hectare, land required = 25 ha.\nSite Z: distance to limestone quarry = 45 km, land price = ₦180,000 per hectare, land required = 22 ha.\n\nCapital cost for a site is calculated as:\nLand cost = land price × land required.\nInfrastructure cost = distance × ₦200,000.\nTotal capital cost = Land cost + Infrastructure cost.\nIf the site is within 50 km of the quarry, the government offers a subsidy equal to 5% of the total capital cost.\nDetermine the net capital cost (after any subsidy) of the most economical site.
Answer Options
About This Question
This is Waec Model Questions Vol1 2021 Geography Question 43. It is one of the objective questions from the 2021 Waec Model Questions Vol1 Geography examination.
Difficulty level: Hard .
Master the Exam!
You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.