Neco Model Questions Vol1 2024 Geography Question 49

Practice objective / multiple choice question 49 from the 2024 Neco Model Questions Vol1 Geography examination.

Neco Model Questions Vol1 2024 Geography Objective / Multiple Choice Hard Difficulty
Question 49 NECO_MODEL_QUESTIONS_VOL1 • 2024 • GEOGRAPHY • objective

A community faces a flood hazard. The probability of a severe flood in any year is 0.02 and the expected damage cost if a flood occurs is \(\text{₦}150\) million.\nOption 1: Build a flood barrier costing \(\text{₦}30\) million (year 0) that reduces the flood probability to 0.005 (damage cost unchanged).\nOption 2: Install a drainage system costing \(\text{₦}45\) million (year 0) that leaves the probability at 0.02 but cuts the damage cost by 40 %.\nAssuming a discount rate of 5 % per annum and a 20‑year planning horizon, calculate the net present value (NPV) of the expected total cost for each option (including the upfront investment). Which single option gives the lower NPV? Give the preferred option and its NPV (rounded to two decimal places, in millions of naira).

Answer Options

Correct Answer A. Flood barrier, NPV = 39.35 million naira
B. Drainage system, NPV = 42.10 million naira
C. Flood barrier, NPV = 45.00 million naira
D. Drainage system, NPV = 38.20 million naira
Correct Answer
A
Correct Option:
Flood barrier, NPV = 39.35 million naira

About This Question

This is Neco Model Questions Vol1 2024 Geography Question 49. It is one of the objective questions from the 2024 Neco Model Questions Vol1 Geography examination.

Difficulty level: Hard .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support