Neco Model Questions Vol1 2019 Geography Question 17

Practice objective / multiple choice question 17 from the 2019 Neco Model Questions Vol1 Geography examination.

Neco Model Questions Vol1 2019 Geography Objective / Multiple Choice Hard Difficulty
Question 17 NECO_MODEL_QUESTIONS_VOL1 • 2019 • GEOGRAPHY • objective

A manufacturing firm is choosing a location for a new factory. Three sites (A, B, C) are evaluated on three cost criteria: transport cost (₦ per ton·km), labour cost (₦ per worker per month) and power cost (₦ per kWh). The decision‑making weights are 0.5 for transport, 0.3 for labour and 0.2 for power (lower cost is preferred). The data are: - Site A: transport 0.08, labour 45 000, power 12\n- Site B: transport 0.06, labour 48 000, power 10\n- Site C: transport 0.07, labour 44 000, power 13 Using the factor‑rating method with normalisation (the lowest cost for each criterion receives a normalised value of 1, other sites receive lowest / their cost), compute the weighted score for each site and state which site should be selected.

Answer Options

Correct Answer A. Site B
B. Site A
C. Site C
D. Site D
Correct Answer
A
Correct Option:
Site B

About This Question

This is Neco Model Questions Vol1 2019 Geography Question 17. It is one of the objective questions from the 2019 Neco Model Questions Vol1 Geography examination.

Difficulty level: Hard .