Gce Model Questions Vol1 2021 Geography Question 4
Practice objective / multiple choice question 4 from the 2021 Gce Model Questions Vol1 Geography examination.
A textile manufacturer is choosing between two possible sites for a new factory. **Site A**: distance to market 80 km, distance to raw‑material source 30 km, 120 workers, wage £12 h⁻¹. **Site B**: distance to market 120 km, distance to raw‑material source 20 km, 100 workers, wage £13 h⁻¹. Both sites use the same transport rates (finished product to market £0.05 t⁻¹ km⁻¹, raw material inbound £0.04 t⁻¹ km⁻¹). Annual production is 200 000 t of product. Each tonne of product requires 1.2 t of raw material. Workers work 8 h day⁻¹, 5 days week⁻¹, 48 weeks year⁻¹. Fixed overheads are £500 000 per year for either site. Calculate the total annual cost for each site and state which site is more economical. Give the total cost for each site in £ (rounded to the nearest thousand) and the preferred site.
Answer Options
About This Question
This is Gce Model Questions Vol1 2021 Geography Question 4. It is one of the objective questions from the 2021 Gce Model Questions Vol1 Geography examination.
Difficulty level: Hard .
Master the Exam!
You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.