Post Utme Unilag 2023 Geography Question 9
Practice objective / multiple choice question 9 from the 2023 Post Utme Unilag Geography examination.
A company is planning to build a new factory in a rural area. The factory will require a minimum of 100 hectares of land. The company has identified two potential locations, Location A and Location B. Location A has 150 hectares of land available, while Location B has 200 hectares of land available. However, Location B is located in a floodplain and is prone to flooding. Which location should the company choose?
Answer Options
About This Question
This is Post Utme Unilag 2023 Geography Question 9. It is one of the objective questions from the 2023 Post Utme Unilag Geography examination.
Master the Exam!
You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.