Post Utme Elizade University 2021 Geography Question 13

Practice objective / multiple choice question 13 from the 2021 Post Utme Elizade University Geography examination.

Post Utme Elizade University 2021 Geography Objective / Multiple Choice
Question 13 POST_UTME_ELIZADE_UNIVERSITY • 2021 • GEOGRAPHY • objective

The Kainji Dam is a major hydroelectric power plant in Nigeria. What is the primary purpose of this dam?

Answer Options

A. Irrigation
B. Flood control
Correct Answer C. Hydroelectric power generation
D. Water supply
Correct Answer
C
Correct Option:
Hydroelectric power generation

About This Question

This is Post Utme Elizade University 2021 Geography Question 13. It is one of the objective questions from the 2021 Post Utme Elizade University Geography examination.

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support