Neco Model Questions Vol1 2021 Economics Question 45

Practice objective / multiple choice question 45 from the 2021 Neco Model Questions Vol1 Economics examination.

Neco Model Questions Vol1 2021 Economics Objective / Multiple Choice Hard Difficulty
Question 45 NECO_MODEL_QUESTIONS_VOL1 • 2021 • ECONOMICS • objective

A city is evaluating a new highway that would connect point A directly to point D. The existing road network gives the following travel times (in minutes): A‑B = 30, B‑C = 20, C‑D = 25, A‑C = 55, B‑D = 45. The proposed highway would have a travel time of \(t\) minutes. There are 10,000 commuters who travel from A to D each day and 5,000 commuters who travel from A to C each day. If the highway is built, commuters will choose the fastest route. Each minute saved per commuter is valued at N5,000. The construction cost of the highway is N10,000,000. Determine the greatest value of \(t\) (in minutes, to one decimal place) for which the project is economically justified (i.e., total benefit ≥ construction cost).

Answer Options

A. t_max = 65.0 minutes
B. t_max = 70.5 minutes
Correct Answer C. t_max = 74.8 minutes
D. t_max = 80.2 minutes
Correct Answer
C
Correct Option:
t_max = 74.8 minutes

About This Question

This is Neco Model Questions Vol1 2021 Economics Question 45. It is one of the objective questions from the 2021 Neco Model Questions Vol1 Economics examination.

Difficulty level: Hard .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support