Gce Model Questions Vol1 2020 Computer Studies Question 28

Practice objective / multiple choice question 28 from the 2020 Gce Model Questions Vol1 Computer Studies examination.

Gce Model Questions Vol1 2020 Computer Studies Objective / Multiple Choice Medium Difficulty
Question 28 GCE_MODEL_QUESTIONS_VOL1 • 2020 • COMPUTER_STUDIES • objective

A processor runs at 2.5 GHz. Its instruction mix is: 30 % ALU (CPI = 1), 25 % Load/Store (CPI = 2), 20 % Branch (CPI = 3), 25 % Floating‑point (CPI = 4). Load/Store instructions suffer a cache miss rate of 5 % and each miss adds a penalty of 20 cycles. (a) Compute the overall CPI of the processor. (b) If the cache is upgraded so that the miss rate falls to 2 % (all other parameters unchanged), compute the new CPI and the percentage improvement in performance.

Answer Options

A. New CPI = 2.65; performance improves by about 6.8 %
B. New CPI = 2.30; performance improves by about 4.2 %
C. New CPI = 2.50; performance improves by about 3.4 %
Correct Answer D. New CPI = 2.50; performance improves by about 5.7 %.
Correct Answer
D
Correct Option:
New CPI = 2.50; performance improves by about 5.7 %.

About This Question

This is Gce Model Questions Vol1 2020 Computer Studies Question 28. It is one of the objective questions from the 2020 Gce Model Questions Vol1 Computer Studies examination.

Difficulty level: Medium .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support