An equipment unit has a constant failure probability per hour of \(0.0002\) when operated without recent maintenance. Performing preventive maintenance reduces the failure probability to \(0.00005\) for the next 200 hours, after which the probability reverts to \(0.0002\) until the next maintenance. The cost of each preventive maintenance action is ₦500, while the cost incurred by a failure (including repair and downtime) is ₦5000. Assuming the unit operates continuously, determine the preventive‑maintenance interval (in hours) that minimises the expected cost per operating hour over the long run. State the optimal strategy.
Answer Options
About This Question
This is City Guilds Model Questions Vol1 2025 Engineering Question 49. It is one of the objective questions from the 2025 City Guilds Model Questions Vol1 Engineering examination.
Difficulty level: Hard .
Master the Exam!
You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.