City Guilds Model Questions Vol1 2025 Engineering Question 19

Practice objective / multiple choice question 19 from the 2025 City Guilds Model Questions Vol1 Engineering examination.

City Guilds Model Questions Vol1 2025 Engineering Objective / Multiple Choice Hard Difficulty
Question 19 CITY_GUILDS_MODEL_QUESTIONS_VOL1 • 2025 • ENGINEERING • objective

In a turning operation the tool‑life relationship is given by \(V T^{0.25}=200\), where \(V\) is the cutting speed in m·min\(^{-1}\) and \(T\) is the tool life in minutes. The machine can operate at cutting speeds between 30 m·min\(^{-1}\) and 80 m·min\(^{-1}\). The machining time for each part is inversely proportional to the cutting speed and is described by \(t_{\text{part}} = \dfrac{8}{V}\) minutes. A batch of 500 parts must be produced. Each tool change takes 10 minutes. Determine the cutting speed that minimises the total production time and give that minimum time (to the nearest minute).

Answer Options

A. Cutting speed = 70 m·min⁻¹; minimum total time ≈ 57 minutes.
B. Cutting speed = 80 m·min⁻¹; minimum total time ≈ 58 minutes.
Correct Answer C. Cutting speed = 73 m·min⁻¹; minimum total time ≈ 55 minutes.
D. Cutting speed = 68 m·min⁻¹; minimum total time ≈ 60 minutes.
Correct Answer
C
Correct Option:
Cutting speed = 73 m·min⁻¹; minimum total time ≈ 55 minutes.

About This Question

This is City Guilds Model Questions Vol1 2025 Engineering Question 19. It is one of the objective questions from the 2025 City Guilds Model Questions Vol1 Engineering examination.

Difficulty level: Hard .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support