A machine operates 24 h per day for 30 days (total planned production time = 720 h). The daily production target is 10 000 units. Actual production recorded is 9 200 units per day. During the month the machine suffered three unplanned breakdowns (each 4 h) and two planned maintenance stops (each 2 h). The reject rate of produced units is 3 %. Compute the Overall Equipment Effectiveness (OEE) as a percentage (rounded to one decimal place) and state whether it meets the benchmark of 85 %.