City Guilds Model Questions Vol1 2024 Engineering Question 35
Practice objective / multiple choice question 35 from the 2024 City Guilds Model Questions Vol1 Engineering examination.
A manufacturer must produce 10,000 units of a steel component. Two production routes are possible:\n\n**Process X (CNC milling)** - Setup time 2 h, cycle time 45 s per part, tool cost \(\$0.12\) per part, achievable dimensional tolerance \(\pm0.02\ \text{mm}\).\n\n**Process Y (investment casting)** - Setup time 5 h, casting time 30 min for each batch of 200 parts, finishing time 20 s per part, tool cost \(\$0.05\) per part, achievable tolerance \(\pm0.05\ \text{mm}\).\n\nThe design specification requires a tolerance of \(\pm0.03\ \text{mm}\). Determine which process can meet the tolerance requirement and calculate the total production time (in hours) for each feasible process. State the selected process and its total time.
Answer Options
About This Question
This is City Guilds Model Questions Vol1 2024 Engineering Question 35. It is one of the objective questions from the 2024 City Guilds Model Questions Vol1 Engineering examination.
Difficulty level: Hard .
Master the Exam!
You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.