City Guilds Model Questions Vol1 2024 Engineering Question 29

Practice objective / multiple choice question 29 from the 2024 City Guilds Model Questions Vol1 Engineering examination.

City Guilds Model Questions Vol1 2024 Engineering Objective / Multiple Choice Hard Difficulty
Question 29 CITY_GUILDS_MODEL_QUESTIONS_VOL1 • 2024 • ENGINEERING • objective

Three machines A, B and C operate in series in a workshop. Their monthly failure rates without preventive maintenance are λ_A = 0.02, λ_B = 0.03 and λ_C = 0.015. A preventive maintenance (PM) performed on a machine for a month reduces that machine's failure rate for that month by 80 % (i.e. the rate becomes 0.2 λ). Each PM requires 2 technician‑hours and costs $100. The workshop has 40 technician‑hours available each month. If any machine fails, the whole system is down for the month and incurs a downtime cost of $10 000. Determine, for a single month, which machines should receive preventive maintenance to minimise the expected total monthly cost (downtime cost plus PM cost). State the optimal PM schedule and the corresponding minimum expected cost.

Answer Options

A. No preventive maintenance; minimum expected cost = $1000
Correct Answer B. Perform PM on A, B and C; minimum expected cost = $429
C. Perform PM on B and C; minimum expected cost = $460
D. Perform PM on A and B; minimum expected cost = $512
Correct Answer
B
Correct Option:
Perform PM on A, B and C; minimum expected cost = $429

About This Question

This is City Guilds Model Questions Vol1 2024 Engineering Question 29. It is one of the objective questions from the 2024 City Guilds Model Questions Vol1 Engineering examination.

Difficulty level: Hard .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support