A component can be produced either by casting or by machining. Casting requires a one‑time mould cost of \(\text{₦}5{,}000\) and a per‑unit cost of \(\text{₦}150\); a single casting batch can contain up to 20 units and needs 4 days of lead time. Machining has no tooling cost, a per‑unit cost of \(\text{₦}250\), and each unit takes 0.5 day to machine. An order for 45 units must be completed within 12 days. Determine the production mix (how many units by casting and how many by machining) that meets the deadline at minimum total cost, and state that minimum cost.

Answer Options

Correct Answer A. All 45 units cast; total cost = ₦11,750
B. 45 units cast; total cost = ₦12,250
C. 30 units cast, 15 units machined; total cost = ₦13,500
D. 40 units cast, 5 units machined; total cost = ₦12,000
Correct Answer
A
Correct Option:
All 45 units cast; total cost = ₦11,750

About This Question

This is City Guilds Model Questions Vol1 2021 Engineering Question 29. It is one of the objective questions from the 2021 City Guilds Model Questions Vol1 Engineering examination.

Difficulty level: Hard .

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support