The Niger River is a major source of hydroelectric power in Nigeria. What is the approximate capacity of the Kainji Dam?

Answer Options

A. 500 MW
B. 1000 MW
Correct Answer C. 2000 MW
D. 3000 MW
Correct Answer
C
Correct Option:
2000 MW