Post Utme Ui 2019 Geography Question 30

Practice objective / multiple choice question 30 from the 2019 Post Utme Ui Geography examination.

Post Utme Ui 2019 Geography Objective / Multiple Choice
Question 30 POST_UTME_UI • 2019 • GEOGRAPHY • objective

The Kainji Dam is a hydroelectric dam located in Nigeria. What is the primary purpose of this dam?

Answer Options

A. Irrigation
B. Drinking water supply
Correct Answer C. Hydroelectric power generation
D. Flood control
Correct Answer
C
Correct Option:
Hydroelectric power generation

About This Question

This is Post Utme Ui 2019 Geography Question 30. It is one of the objective questions from the 2019 Post Utme Ui Geography examination.