Post Utme Lead City University 2025 Geography Question 37

Practice objective / multiple choice question 37 from the 2025 Post Utme Lead City University Geography examination.

Post Utme Lead City University 2025 Geography Objective / Multiple Choice
Question 37 POST_UTME_LEAD_CITY_UNIVERSITY • 2025 • GEOGRAPHY • objective

A company is considering investing in a new project that will require the extraction of 100,000 tons of limestone per year. The company has identified two possible locations for the quarry: Location A and Location B. Location A has a reserve of 500,000 tons of limestone, while Location B has a reserve of 750,000 tons. If the company wants to extract the limestone for 5 years, which location should it choose?

Answer Options

A. Location A
Correct Answer B. Location B
C. Both locations are equally suitable
D. Neither location is suitable
Correct Answer
B
Correct Option:
Location B

About This Question

This is Post Utme Lead City University 2025 Geography Question 37. It is one of the objective questions from the 2025 Post Utme Lead City University Geography examination.

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support