Post Utme Futa 2018 Geography Question 19

Practice objective / multiple choice question 19 from the 2018 Post Utme Futa Geography examination.

Post Utme Futa 2018 Geography Objective / Multiple Choice
Question 19 POST_UTME_FUTA • 2018 • GEOGRAPHY • objective

The diagram below shows the structure of a hydroelectric power plant. Which of the following components is NOT a part of this system?

Answer Options

A. Dam
B. Turbine
C. Generator
Correct Answer D. Pump
Correct Answer
D
Correct Option:
Pump

About This Question

This is Post Utme Futa 2018 Geography Question 19. It is one of the objective questions from the 2018 Post Utme Futa Geography examination.

Master the Exam!

You've seen a preview, but there are thousands more questions plus AI tutor to break down complex solutions.

Unlock Full Access Available for Android & Windows
Chat with Support