Question 15 POST_UTME_ABU • 2017 • GEOGRAPHY • objective

A company is planning to build a new factory in a rural area. The factory will produce 1000 tons of waste per year. If the waste is to be disposed of in a landfill, what is the volume of the landfill required, given that the waste density is 0.5 tons/m^3?

Answer Options

A. 2000m^3
B. 3000m^3
Correct Answer C. 4000m^3
D. 5000m^3
Correct Answer
C
Correct Option:
4000m^3